Societal Watch
The Virtual Incubator is The NetPlusUltra®
10/09/2018 17:45
This subject matter-related chronological roadmap proposes a final synthesis of everything that must be remembered about the first two phases of instruction-incubation with regard to the development history of my NetPlusUltra® master-franchising solution for web authors. As a conceptual complement to my Lifefolio website (1), which is dedicated to the virtualization of the contextual space-time continuum through which I have defined my life project, the present timeline implies the prior consultation of the Funding section thereto (2).
Prerequisites
Continue readingFlashbacks to the Future
10/09/2018 17:29
2003-2012 : The Virtual Incubator
Windows-enabled instruction phase 1/3.Continue readingParadigm Shift
10/09/2018 16:57
2012-2017 : NetPlusUltra®
MacOS-enabled publication phase 2/3.Continue readingLegal Validation (Intermission)
10/09/2018 16:27
2018-2023 : Planet+Ultra®
Preparation of production phase 3/3+ in a dedicated server environment, with a view to the implementation of the source code(x) to the "Next Generation Web".To be followed through at
Continue reading